I would love to be able to grab the top bar on the timeline, and be able to move the whole project / list at once. This would then keep all of the due dates and spacing between each of the tasks the same. That was you can schedule out a project / list, but then be able to move the whole thing at once. 
Date
Votes
2 comments
-
CM Official comment That's a brilliant idea! We'll play with this idea and see how it works out.
-
CM This feature will be coming in Pagico 8.18.
Please sign in to leave a comment.